
Shotcrete Australia played a key role in the Kiama Railway Station Upgrade, part of the Transport for NSW (TfNSW) Rail Upgrade Programme. This project aims to modernise the rail network, increase station capacity, and improve services on the South Coast railway line.
The Kiama Platform Extension was a major component of this upgrade, designed to support growing passenger demand and improve connectivity. Shotcrete Australia was engaged to deliver essential ground engineering solutions to stabilise and reinforce the new infrastructure.
Scope of Work: Delivering Stability and Strength
Shotcrete Australia provided critical ground retention and stabilisation works, ensuring the long-term integrity of the platform extension. Our scope included:
- 500m² of steel-reinforced shotcrete for structural reinforcement
- Installation of over 300 soil nails to stabilise the platform extension
- Bulk excavation and detailed trimming to prepare the site for new infrastructure
These works were essential in securing the platform extension and ensuring it could withstand increased rail activity and passenger flow.

Overcoming Challenges to Deliver on Time
Rail projects require precise execution, particularly in live operating environments. The Kiama Railway Station Upgrade presented several challenges, including:
- Working within tight site constraints requiring precision excavation and shotcrete application
- Minimising disruption to active rail operations while maintaining project efficiency
- Meeting strict safety and compliance standards
Shotcrete Australia’s experienced team successfully navigated these challenges, ensuring the project was delivered on time and within budget while maintaining the highest standards of safety and quality.
Building Reliable Rail Infrastructure for the Future
The Kiama Railway Station Upgrade is a critical step in improving rail services on the South Coastline. Shotcrete Australia is proud to have contributed to this vital infrastructure project, ensuring the stability and durability of the new station platform.
We look forward to continuing our work on major rail and infrastructure projects, delivering expert ground engineering, anchoring, and shotcreting solutions across Australia.