Project Overview
Shotcrete Australia was engaged to deliver critical temporary anchoring works at One City Square, a transformative mixed-use development located at 83 Church Street, Parramatta. Delivered by our long-standing and valued client, JQZ, this landmark project is revitalising an entire city block with a high-end blend of residential, commercial, hospitality, and public space in the heart of Parramatta’s CBD.
One City Square is set to become one of Western Sydney’s premier urban developments, comprising:
497 premium residential apartments
Over 22,000 sqm of commercial space
A 12-level luxury hotel
Dining, retail, and public piazza zones
Extensive landscaped open space
Scope of Work
The scale and prominence of the development demanded sophisticated engineering to support the safe and efficient delivery of a multi-level basement structure within a constrained city environment.
Shotcrete Australia was responsible for the delivery of a robust temporary retention system to enable deep excavation. This included:
- Thousands of linear metres of temporary strand anchors
- Shotcrete & Steel shoring systems
- In ground drainage system
These works were delivered in staged sequences to match excavation progression and to maintain structural integrity throughout all phases of construction.
Anchoring System and Technical Approach
The ground retention strategy relied on temporary strand anchor systems, designed to provide active lateral support during excavation of the basement levels. These high-tensile steel strand anchors were installed in drilled boreholes, grouted, and stressed to meet engineered design loads.
All systems were installed in accordance with relevant Australian Standards, ensuring full compliance with safety, performance, and durability requirements.
Collaboration and Design Excellence
Shotcrete Australia worked closely with Pile Design Solutions (PDS) — the project’s geotechnical and design consultants — in a collaborative and solutions-driven relationship. The open and professional communication between our teams enabled seamless translation of design into field execution, even as conditions evolved.
Additionally, Shotcrete Australia maintained a cooperative on-site relationship with both JQZ’s site teams and the principal excavation stakeholders, contributing to a unified delivery approach and efficient program outcomes across all phases of the works.
Challenges and Solutions
As with many CBD developments, the project presented logistical and geotechnical challenges — including constrained access, staging requirements, and interface with nearby infrastructure. Our operations and engineering teams responded with agility, experience, and precision — aligning anchor installation to excavation milestones, and implementing appropriate environmental and safety controls throughout.
Project Outcome
Shotcrete Australia is proud to have supported JQZ on this landmark development. Our involvement in One City Square reflects our commitment to delivering technically advanced, safety-first ground engineering systems, backed by collaborative partnerships and a focus on construction excellence.